Strengthening of Lozenets compressor station excavations
"Modernization of 3 compressor stations by integrating 4 low-emission gas turbocharger units", Construction 2 - Reconstruction of Lozenets with construction of 2 new GTKA
- Client
- BULGARTRANSGAS EAD
- Designer
- CHEMKOMPLEKT ENGINEERING AD
- Main contractor
- DZZD "Gas Turbine"
- Subject
- Pilot cantilever reinforcement with pouring piles
- Design
- Structures
- Phase/stage
- in operation