Strengthening of Lozenets compressor station excavations

Strengthening of Lozenets compressor station excavations

"Modernization of 3 compressor stations by integrating 4 low-emission gas turbocharger units", Construction 2 - Reconstruction of Lozenets with construction of 2 new GTKA

Client
BULGARTRANSGAS EAD
Designer
CHEMKOMPLEKT ENGINEERING AD
Main contractor
DZZD "Gas Turbine"
Subject
Pilot cantilever reinforcement with pouring piles
Design
Structures
Phase/stage
in operation