MUSICAL SCHOOL

MUSICAL SCHOOL

Change of purpose of an existing building, reconstruction, strengthening, superstructure in a boutique hotel and concert hall

Client
Central Point Ltd
Architecture
Arch.Nikolay Simeonov,VAMOS Ltd
Main contractor
Greentech Engineering Solutions
Subject
Reconstruction of a former Music School in a boutique hotel
Design
Structures
Main structural material
reinforced concrete ,brick walls and metal structure
Characteristics
– the existing building is 6-storey / basement, ground floor and 4 floors /
– reinforcement of existing reinforced concrete elements
– two new reinforced concrete beam slabs
– new metal spatial roof structure with intermediate level
Phase/stage
in operation since 2018