MUSICAL SCHOOL
Change of purpose of an existing building, reconstruction, strengthening, superstructure in a boutique hotel and concert hall
- Client
- Central Point Ltd
- Architecture
- Arch.Nikolay Simeonov,VAMOS Ltd
- Main contractor
- Greentech Engineering Solutions
- Subject
- Reconstruction of a former Music School in a boutique hotel
- Design
- Structures
- Main structural material
- reinforced concrete ,brick walls and metal structure
- Characteristics
- – the existing building is 6-storey / basement, ground floor and 4 floors /
– reinforcement of existing reinforced concrete elements
– two new reinforced concrete beam slabs
– new metal spatial roof structure with intermediate level - Phase/stage
- in operation since 2018