MIII - MC1 - Sitnyakovo and MC2 - Geo Milev

MIII - MC1 - Sitnyakovo and MC2 - Geo Milev
Client
SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
Architecture
"PROARCH" Jsc.
Main contractor
"METRO SHIPKA" Consortium
Facility length
MC 1 - 144.40 m + entrances; MC 2 - 120.45 m + entrances
Facility width
MC 1: 13.65 - 18.50 m; MC 2: 12.65 - 17.35 m
Facility height (depth)
MC 1: 18m. ; MC 2: 18m.
Design
Structures
Built-up Area (BUA)
MC1: 2600m2; MC2: 2100m2
Main structural material
reinforced concrete
Characteristics
- Top-down and open-cut construction
- MC 1: four blocks; MC 2: three blocks
- Entrances/exits MC 1: 3; MC 2: 3
Phase/stage
under construction since 2024