MIII - MS - 16 Mysia/NBU
Sofia Metro Extension Project, Third Metro Line - Botevgradsko Shosse Blvd. - Vladimir Vazov Blvd. - Central part of the city - Ovcha Kupel residential area with 2 metro stations
- Client
- SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
- Architecture
- BIAS-M Ltd, arch.Evangelina Sirakova
- Main contractor
- METROBUILD WEST ASSOCIATION
- Facility length
- 155 m + entrances
- Facility width
- 18.3-22.80 m
- Facility height (depth)
- 16 m
- Design
- Complex design
- Built-up Area (BUA)
- 3320 кв.м.
- Main structural material
- reinforced concrete
- Technologies and features
- Top-down and open mode
- four blocks
- 6 different exits; - Phase/stage
- in operation since 2021