MIII - MS - 16 Mysia/NBU

MIII - MS - 16 Mysia/NBU

Sofia Metro Extension Project, Third Metro Line - Botevgradsko Shosse Blvd. - Vladimir Vazov Blvd. - Central part of the city - Ovcha Kupel residential area with 2 metro stations

Client
SOFIA MUNICIPALITY / "METROPOLITEN" Jsc.
Architecture
BIAS-M Ltd, arch.Evangelina Sirakova
Main contractor
METROBUILD WEST ASSOCIATION
Facility length
155 m + entrances
Facility width
18.3-22.80 m
Facility height (depth)
16 m
Design
Complex design
Built-up Area (BUA)
3320 кв.м.
Main structural material
reinforced concrete
Technologies and features
Top-down and open mode
- four blocks
- 6 different exits;
Phase/stage
in operation since 2021