Metrodepo Zemlane
Building of the Year 2019 - first prize in the category of projects related to the development of cities
Project for extension of the Metro in Sofia, Third Metro Line - Botevgradsko Shosse Blvd. - Vladimir Vazov Blvd. - Central City Unit - Ovcha Kupel, First Stage - Metrodepo Zemlyane / Geostroy AD
- Client
- Sofia Municipality, Metropolitan EAD
- Architecture
- BIAS-M Ltd, RGB Ltd, Konkurent 90 OOD
- Main contractor
- Association of Geometro Zemlyane with the main contractor Geostroy AD and partners Transpemontcty EAD and BIAS - M Ltd
- Площ
- 106 830m²
- Design
- Architecture and Constructions
- GARAGE HALL:
- Characteristics
- - one-storey three-nave hall
- reinforced concrete prefabricated skeletal structural system
- dimensions in plan - 171.5m / 67.7m
- clear height to the lower edge of the main beam - from 6.10m to 6.45m
- constructive wheelbases - 12.2m / 20m, 23m and 24m
- roof construction - prestressed roof beams, prestressed capitals, sheet metal - REPAIR HALL AND BOILER ROOM:
- Characteristics
- - one-storey and two-storey two-nave hall
- reinforced concrete prefabricated skeletal structural system
- dimensions in plan - 107m / 37.3m - АДМИНИСТРАТИВНА СГРАДА:
- Characteristics
- – монолитна стоманобетонна, скелетна, безгредова конструктивна система
– размери в план – 48.25m / 18m - TRANSPORT PASSAGE:
- Characteristics
- - non retaining open excavation with slopes;
- two-opening, monolithic, closed, reinforced concrete structure - "box" type
- clear span distance - 8.25 m;
- clear height of structure - 4.65m
- the facility covers a tunnel part and two ramps
- total length of the facility - 168m
- the track development of the landfill passes over the structure - OTHERS
- - car wash
-train wash
- gas station
- parking
- street network - Phase/stage
- in operation since 2019