Garritage Park - Office Buildings 1 & 2

Garritage Park - Office Buildings 1 & 2

Building of the Year 2020 - winner in the categories of sports, office and corporate buildings and buildings with elements of "green" architecture and innovation

Conversion of a commercial complex into a complex with a mixed function - for administrative and public services, office buildings, residential buildings, hotel, school, TP, hub station and PG - "Malinova Dolina - Bunkera", Sofia

Client
GARITAGE INVESTMENT MANAGEMENT Ltd.
Architecture
STEPHEN GEORGE INTERNATIONAL – BULGARIA Ltd.
Main contractor
GP GROUP Jsc.
Plan dimensions
213,5 / 87,5 m
Floors (above ground + basement)
7 + 3
Design
Structures
CGA - Construction Gross (building) Area
100 000 m²
Excavation with retaining structure
"Berlin wall" - soldier (steel) piles and timber lagging + soil nail shotcrete slope
Main structural material
cast in place reinforced concrete (+ prestressed reinforced concrete beams)
Structural type system
skeleton-frame structure - columns, shear walls and flat slabs with drop panels
Structural grid spacing
9 (12) / 8 m
Foundation
mat foundation with slab thickness of 60 and 120 cm
Roof - type & material
cast in place reinforced concrete
Phase/stage
in operation from 2020