Garritage Park - Office Buildings 1 & 2
Building of the Year 2020 - winner in the categories of sports, office and corporate buildings and buildings with elements of "green" architecture and innovation
Conversion of a commercial complex into a complex with a mixed function - for administrative and public services, office buildings, residential buildings, hotel, school, TP, hub station and PG - "Malinova Dolina - Bunkera", Sofia
- Client
- GARITAGE INVESTMENT MANAGEMENT Ltd.
- Architecture
- STEPHEN GEORGE INTERNATIONAL – BULGARIA Ltd.
- Main contractor
- GP GROUP Jsc.
- Plan dimensions
- 213,5 / 87,5 m
- Floors (above ground + basement)
- 7 + 3
- Design
- Structures
- CGA - Construction Gross (building) Area
- 100 000 m²
- Excavation with retaining structure
- "Berlin wall" - soldier (steel) piles and timber lagging + soil nail shotcrete slope
- Main structural material
- cast in place reinforced concrete (+ prestressed reinforced concrete beams)
- Structural type system
- skeleton-frame structure - columns, shear walls and flat slabs with drop panels
- Structural grid spacing
- 9 (12) / 8 m
- Foundation
- mat foundation with slab thickness of 60 and 120 cm
- Roof - type & material
- cast in place reinforced concrete
- Phase/stage
- in operation from 2020